Project Locations

Current News:

February 2012

Marin Builders Association Spotlight

Precision General Commercial Contractors was featured in the Marin Builders Association Weekly Bulletin. The article highlights our expertise in multi-family construction.

Read more here. (PDF opens in new tab.)

 

January 2012

Sacramento Business Journal's Top General Contractors

We're pleased to once again be listed in the Sacramento Business Journal's list of Top General Contractors in their January 27, 2012 issue.

Click here for larger pdf version.

 

December 2011

Duane Hill Terrace

Location: 600 North Orchard Avenue, Ukiah, CA
Units: 32 Low Income Units
Completion: December, 2011
Developer: Rural Communities Housing Development Corporation http://www.rchdc.org/
Architect: Tierney/Figueiredo Architects, www.tfarch.com
Cost: 4,5 million

Description: Duane Hill Terrace is a Multi Family Housing Community, a new development, completed by Precision General Commercial Contractors, Inc. in December 2011. The project consists of 3 buildings with 32 unit apartments that are 3 stories high for low income housing. The site includes a community room, a laundry room, an office and a courtyard with benches and other outdoor activities equipment. The excavation started on April 6, 2011 giving PGCC a 9 month time frame to complete the project which was attained. Along with a early completion date PGCC rebated to the Owner the Savings in General Conditions which was significant. The project completed and was 100% occupied by the end of December 2011.

Precision GCC, Inc would like to Thank all the Subcontractors who made it possible and the owner RCHDC.

If you have any questions on this project please contact us.

 

November 2011

Eden Lodge Apartments

Location: 400 Springlake Drive, San Leandro, CA
Units: 143 Senior Units
Completion: November, 2011
Developer: Eden Housing, Inc http://www.edenhousing.org/
Architect: Charlie Pick Basis Architecture and Consulting http://www.basisarch.com/
Cost: 4 Million

Description:"The Eden Lodge Apartments”, located in San Leandro is a 143 unit apartment community which was renovated and completed by PGCC, Inc. in November 2011.

Aesthetic improvements to the exterior included the installation of new structural elements for patio shading, dual glazed windows, patio sliding doors and a complete repainting of the building exterior.

The interior units were retrofitted with new cabinetry and countertops, doors, tub and tub surrounds, floor coverings, an interior paint application and window treatments. Common area feature upgrades included new floor coverings, paint, upgrades to the four elevators, and improvements to the fire alarm and suppression system.

Site work improvements included a community garden, efficient site lighting upgrades and an overlay of the existing parking lot with bituminous paving. Most noteworthy on this project was the mandate to improve efficiency with utility consumption, so a complete passive solar system was installed on the massive roof structure on the building which will support the effort for reducing operating costs for this well established and respected senior community in the East Bay."

 

October 2011

PGCC New QR Code


September 2011

Hotel Berry Steel Brace Frame

Hotel Berry brace frame installation

PGCC completes the installation of the 5 story Steel Brace Frame at the Berry Hotel Project. The Brace frame is part of the Seismic upgrades to the 80 year old Structure.

Special Thanks to SHRA and Jamboree Housing for facilitating the late evening installation project.


August 2011

Clara Court Apartments

Project: Clara Court Apartments, 32 Apartment Units of New Construction
Owner: RCHDC
Architect: Tierny/Figueiredo Architects
Location: Ukiah, CA

PGCC is quickly completing the 32 Unit Clara Court Project. The project is approx. 60% complete with a delivery of units scheduled for November 2011. Shook and Waller completed the framing within ten weeks using a panelized roof and Wall System customized to the project and keeping the 8 month construction schedule on track.


June 2011

Coventry Gardens Community Building

The 2500 square foot Coventry Gardens Community Building combines rental office and resident community center.

The rental office offers reception area; file room and manager office space.

The community center provides residents 800 sq ft of mingling space; a full size kitchen with stainless steel appliances and custom cabinets in addition to a 4-person computer station equipped with printer and fax.

Laundry facilities are sourced by solar generated tankless hot water heaters. There are 12 washers and 18 dryers with folding station and laundry sink.


Coventry Gardens

Owner: Coventry gardens Associates LLC, Atlantic American Partners
Architect: Cox, Kliewer and Company
Engineer : Strifler Engineering
Cost : $9,000,000.00
Duration : 12 months

Project: PGCC completed the Nine million dollar project within 12 months. The project consisted of the Rehabilitation of 164 units in 24 Buildings. Building were completed in pairs with a 40 day completion duration for each pair.The significant items were the complete new installation of HVAC, Site Electric, Site Electric Metering,Roofing, Siding, Brick Facade, Kitchens,Windows, Doors. Furthermore PGCC built a New Community Center and Central Laundry Facility with a integrated Solar Hot Water system.

For more information please contact PGCC.


April 2011

Boulevard Court Apartments

Owner: Mercy Housing
Architect: Anders & Falltrick Architects
Engineer: H. James OKi Engineering
Cost: $8, 500,000.00
Duration: 14 months.

Project: PGCC completed the rehabilitation and new construction in a span of fourteen months. The major improvements included new interior finishes and trim, cabinetry, granite countertops, windows, entrance doors, privacy doors and remotely controlled split system air conditioning units; elevated deck & stair towers; seam metal roof with photovoltaic; community picnic tables and trellis area; basketball court; parking lot with accessible flat work.

The buildings were all clad in either stucco or lap siding. An 1,800 square foot community building was constructed, as well as a substantial addition to the existing office area, which includes staff offices, counseling centers, medical examination rooms, a computer learning center and a large meeting room. All existing site utilities were abandoned and removed and a new utility infrastructure placed into service.

Off site improvements included city sidewalk, curb and gutter and pavement repair work upon the major thoroughfare adjacent to the project.

For more information please contact PGCC.



Brentwood Seniors Solar PV and Elevated Walkway project

Owner: Eden Housing
Architect: Struthers Dias Architects
Engineer : JR Structural Engineering, Inc. and BWF Consulting Engineers
Solar Company : EcoPlexus

Project: PGCC installed a 300 feet walkway, Hydraulic Elevator and a 38.5 KW Photovoltaic System for the Brentwood Seniors Complex. The building solution provided the senior residents with much needed walkway and elevator connections. The Raised walkway provided a perfect platform to install a canopy of solar panels, thereby providing greater access and significant energy savings for the community.

For more information please contact PGCC.


April 2011

Clara Court Apartment Foundation being Poured on 04.20.11

Clara Court foundation being poured

The Clara Court Project being Built by PGCC Consists of 32
Units of New Construction in Ukiah California.

Contact PGCC for more details.


February 2011

Berry Hotel Renovation Begins

Berry Hotel Renovation Begins

PGCC is renovating a historic hotel in downtown Sacramento. Originally built in 1929,
The Hotel Berry will be ready for tenants early next year. Click here to watch the video

December 2010

New Coventry Apartment Construction Progress

New Coventry Apartment Clubhouse

PGCC is completing the 3,500 sf New Coventry Apartment Clubhouse Facility. Richmond, VA

November 2010

Virginia Beach

PGCC was retained to complete the Rehabilitation and New Construction of 300 Units in Virginia Beach, VA.

The Total project cost was approx. 10,000,000.00.

Duration 12 Months, Completion 4 months ahead of schedule.

Exterior Upgrades Exterior Upgrades

Exterior Upgrades included New Windows, Siding, Roofs, Lighting and Security System

Community Center Community Center

Nearing Completion of a the New Community and Recreation Center.


September 2010

Boulevard Court

Boulevard Court Progress

Boulevard Court, Hotel to Apartment Conversion progress Photo September 1, 2010.


July 2010

Caurus Academy Charter School

Caurus Academy Charter School

Caurus Academy Charter School

PGCC has started Caurus Academy Charter School in Phoenix Arizona. The Charter school consist of 17 specialized classrooms catering to the arts along with studio facilities and a large gymnasium.

PGCC entered into a Fast Track Contract on March 28th and will complete the project in Early August to start the New School year.


May 2010

Budget Inn Construction Progress

Phase One of the Budget Inn Project April 2010


April 2010

Sac Builders Exchange Design Build Competition

Precision sponsors the Sac Builders Exchange Design Build Competition

High School Students in the Design
						Build Competition

High School students from 18 Sacramento Region schools compete in the design,
plan review, safety, and construction phases of a 96-foot structure.

Website: http://sacregionbx.com/designbuild/


November 2009

Casa de Angelo

Sacramento, Ca

(Click on images to enlarge)

Business Office - After
Business Office - After
Business Office  - Before
Business Office - Before
Building - After
Building - After
Building - Before
Building - Before
Building Angle - After
Building Angle - After
Building Angle - Before
Building Angle - Before

The Casa de Angelo renovation encompassed the remediation of original construction defects; rehabilitation of connectivity areas; installation of significant energy upgrades. (Read more here...)


October 2009

Broadway

Sacramento, Ca

(Click on images to enlarge)

Community Building - After
Community Building - After
Community Building - Before
Community Building - Before
Building 1 - After
Building 1 - After
Building 1 - Before
Building 1 - Before

The Broadway renovation encompassed the corrections of original construction defects and significant energy upgrades. (Read more here...)


2009

Mercy Village Architect's Letter


2009

Corona Ranch Apartments

Project: Corona Ranch Apartments (78 units)
Waterproofing and Stair Replacement

In concert with the owner, we are facilitating project completion while units are fully occupied, avoiding relocation requirements and providing only minor inconvenience to tenants.

Location: Petaluma, CA
Client: Eden Housing, Hayward, CA
Architect: Weir Andrewson Associates, Inc. San Rafael, CA

Corona Ranch Temporary Stairs
Project underway with temporary stair assembly

                                                                                                                                                                                                                                                                                                                                                                            


Precision General Commercial Contractors, Inc.
Corporate Office · 300 Turney Street, Second Floor · Sausalito, CA 94965 · Phone: (415) 332-8390 · Fax: (415) 332-8391
West Coast Regional Office · 5580 Power Inn Road, Suite G · Sacramento, CA 95820 · Phone: (916) 381-4640 · Fax: (916) 381-4819